Ontario Energy Board Issues Notice of Hearing for 2027-31 Electricity Transmission Rates (EB-2026-0152)
For the latest documents filed with the Ontario Energy Board (OEB), please visit: https://www.rds.oeb.ca/CMWebDrawer/Record?q=casenumber:EB-2026-0152&sortBy=recRegisteredOn-&pageLength=400#form1
OEB Notice of Hearing (English)
Wataynikaneyap Power recognizes that the land on which Wataynikaneyap Power has its head office is the Homeland of Animikii Wajiw. Gitchi Gami Anishinabek are signatory to the Robinson-Superior Treaty of 1850. The Wataynikaneyap Power transmission system is located within the Homelands of Treaty 9 and Adhesions; Treaty 3 and Adhesions; and Treaty 5 and Adhesions, through the true spirit and true intent as understood by our Elders.