Planned inspections
- Helicopter inspections of transmission lines once a year
- Ground inspections of transmission lines every 5 years
- Detailed Inspection of substations multiple times a year
Substation equipment testing and maintenance
- Ground operational checks and minor site maintenance of substations multiple times a year
- Detailed testing and maintenance of substation equipment will vary by equipment and location
Emergency Response
- Wataynikaneyap Power personnel are on-call 24/7 for emergencies and will work with the contractor and others to coordinate emergency response
- Visit our Emergencies and Outages page for more information
Wataynikaneyap Power recognizes that the land on which Wataynikaniyap Power has its head office is the Homeland of Animikii Wajiw. Gitchi Gami Anishinabek are signatory to the Robinson-Superior Treaty of 1850. The Wataynikaneyap Power transmission system is located within the Homelands of Treaty 9 and Adhesions; Treaty 3 and Adhesions; and Treaty 5 and Adhesions, through the true spirit and true intent as understood by our Elders.