Will Wataynikaneyap be building all-season roads along the transmission line?

Submitted by patrickboileau on Thu, 09/15/2016 - 13:20
The majority of right-of-way clearing work will happen in winter, which will limit the need for permanent access roads along the corridor. The routing is being selected, to a great extent, to be either close to existing roads, or to where future roads are being planned. There will be access trails constructed under lines in some areas, but not a public all-season road. We will also build spurs off of existing roads to access the line in some locations, and some of those spurs will be required as permanent access to the line.